Key takeaways
- A site visit comes first and decides most of the plan.
- Permits and inspections protect you and your insurance.
- The pad, fuel and electrical work follow a set order.
- A final test under load ends the job.
The site visit
We look at the lot, the electrical panel, the gas meter or fuel plan and any HOA rules. We measure clearances and talk through your goals.
You leave with a recommendation and a clear next step.
Permits and approvals
Most installations need an electrical permit, and gas work may need one too. Some neighborhoods also need HOA approval.
We prepare the information and coordinate the steps.
Installation day
The pad is prepared, the generator is set, fuel and conduit are run and the transfer switch is installed and wired.
Larger jobs may take more than one visit.
Inspection and testing
After the work, inspectors review it and we test the system under load. We walk you through the controller and the maintenance schedule.
Keep your paperwork in one place.
Quick answers
Do I have to be home?
It helps for the site visit and the final walk-through. For the rest, we only need access.
Will you tell me how long the job takes?
Yes. We give you a schedule once permits and equipment are confirmed.